Project
Scope of work |
: El Sauz Project
: Manufacturing of 01 (one) Bypass system (Gas path 5.600mm) |
Location
Investo Weight |
: Mexico
: American Air Filter Company, Inc. : 230 Tons |
Period | : 8/2022-01/2023 |
Project
Scope of work |
: El Sauz Project
: Manufacturing of 01 (one) Bypass system (Gas path 5.600mm) |
Location
Investo Weight |
: Mexico
: American Air Filter Company, Inc. : 230 Tons |
Period | : 8/2022-01/2023 |
Head office: 134/3 Dao Duy Anh Str, Ward 9, Phu Nhuan District, HCMC
028 3839 6231 Fax: 028 3839 6235
Lorem ipsum dolor sit amet, consectetur adipiscing elit.