Project
Scope of work |
: B.Grimm Project.
: Fabrication Diverter, Guillotine, Ducts D.N 3.050 x 3.050mm |
Location
Investo Weight |
: Thailand
: American Air Filter Company, Inc. : 370 Tons |
Period | : 12/2021-6/2022 |
Project
Scope of work |
: B.Grimm Project.
: Fabrication Diverter, Guillotine, Ducts D.N 3.050 x 3.050mm |
Location
Investo Weight |
: Thailand
: American Air Filter Company, Inc. : 370 Tons |
Period | : 12/2021-6/2022 |
Head office: 134/3 Dao Duy Anh Str, Ward 9, Phu Nhuan District, HCMC
028 3839 6231 Fax: 028 3839 6235
Lorem ipsum dolor sit amet, consectetur adipiscing elit.